cmom program

Capacity, Management, Operation & Maintenance (CMOM) Program

A Capacity, Management, Operation and Maintenance (CMOM) Program has been prepared by Fox Metro to meet the requirements of Special Condition 18 of National Pollution Discharge Elimination System (NPDES) Permit Number IL0020818, dated March 1, 2019 from the Illinois Environmental Protection Agency.

This CMOM program has been prepared to provide a centralized document that can be used to more effectively and efficiently manage, operate and maintain the sanitary collection system owned and operated by the District. The goal of the CMOM plan is to manage, operate and maintain the sanitary collection system for the lowest practical customer cost and to protect public health.

Fox Metro prepares annual reports documenting progress as required by the NPDES permit. Abbreviated copies are provided below for the public’s use.

Contact our Public Relations Department at pr@foxmetro.org to ask questions or provide comments on our CMOM.

CMOM Summary

This goal is Supported By:

wired outline 24 approved checked 2

Maintaining regulatory compliance

wired outline 1392 align objects bottom 1

Establishing and re-evaluating the desired Level of Service

wired outline 2531 recurring cash 1

Investing in the proactive maintenance of all inventoried assets, thus reducing the overall cost for the lifecycle management of those assets

wired outline 47 to do list 1

Assessing the performance of the collection system in terms of minimizing releases, insuring that sufficient capacity exists and to improve, and when necessary, replace assets as determined to be needed

This CMOM Plan Focuses on:

As stated in the NPDES permit, the CMOM program focuses on reducing or eliminating preventable sanitary sewer overflows.

wired outline 1858 waterfall 1

Minimizing the effects of sanitary sewer overflows and basement back-ups

wired outline 409 tool 1

Investigating, repairing and mitigating releases

wired outline 19 magnifier zoom search 1

Identifying the cause of the sanitary sewer overflow or basement back-up, making necessary repairs, identifying operational improvements and identifying structural issues within the system for potential upgrade or repair

Did you know you can pay your bill online?

Fox Metro offers paperless billing and online payments, including automatic payments, at no additional cost. Sign up today!

Pay My Bill

mascot